Product Details
Place of Origin: Guangdong
Brand Name: Xinda Pelosi
Certification: ISO9001,BRCS
Model Number: XPP
Payment & Shipping Terms
Minimum Order Quantity: 100000pcs
Price: Negotiable
Packaging Details: Inner poly bag outer carton, Standard export carton packing or customized
Delivery Time: 15days
Payment Terms: T/T, Western Union, MoneyGram
Supply Ability: 5000000 Piece/Pieces per Day
Product Name: |
Stamping Bottle Caps |
Use: |
Bottles |
Collar Material: |
Non Spill |
Metal Type: |
Plastic |
Color: |
As Your Request |
MOQ: |
10000pcs |
Closure: |
Ribbed |
Application: |
Spraying |
Logo: |
Custom Logo |
OEM/ODM: |
Acceptble |
Product Name: |
Stamping Bottle Caps |
Use: |
Bottles |
Collar Material: |
Non Spill |
Metal Type: |
Plastic |
Color: |
As Your Request |
MOQ: |
10000pcs |
Closure: |
Ribbed |
Application: |
Spraying |
Logo: |
Custom Logo |
OEM/ODM: |
Acceptble |
High production efficiency: stamping is an efficient production method that can quickly manufacture a large number of bottle caps to meet the needs of large-scale production.
High material utilization: Through reasonable stamping process design, the waste of materials can be minimized, the utilization rate of materials can be improved, and the cost can be reduced.
Good strength and rigidity: During the stamping process, the material is plastic deformed to make its molecular structure tighter, thereby improving the strength and rigidity of the bottle cap and better protecting the contents of the bottle.
High precision: The stamping process can achieve high dimensional accuracy and shape accuracy, ensuring the tight fit of the cap and the bottle mouth to prevent leakage.
Good appearance quality: the surface of the stamped bottle cap is smooth and flat, without obvious defects and defects, and has a good appearance quality.
A variety of shapes and structures can be achieved: the stamping process can produce bottle caps of various shapes and structures to meet the packaging needs of different products.
Easy to automate production: The stamping production process is suitable for using automated equipment to operate, which can improve production efficiency, reduce labor costs, and ensure the stability of product quality.
Preparation: Bottle caps are typically manufactured from metal (such as aluminum or tin-plated steel) or plastic. Before stamping, the caps are cleaned and prepared to ensure a smooth surface for imprinting.
Stamping Machine: Specialized stamping machines or equipment are used for the stamping process. These machines are designed to apply pressure to transfer the desired design onto the bottle caps.
Die and Design: A die or stamping plate containing the desired design, logo, or text is positioned over the bottle cap. The die is typically made of hardened steel and has raised letters or images that will imprint onto the cap.
Stamping Operation: The stamping machine applies pressure to the die, pressing it against the bottle cap. This pressure causes the design on the die to be transferred onto the surface of the cap through indentation or embossing.
Quality Control: After stamping, the imprinted bottle caps are inspected for quality assurance. This includes checking for legibility, alignment, and overall appearance of the stamped design.
Stamping bottle caps refers to a process where designs, logos, or information are stamped or imprinted onto the surface of bottle caps. This technique is commonly used for various purposes, including branding, identification, and decorative customization of bottle caps used in beverage packaging.
MOQ |
10000pcs |
Lead time |
10 days |
Payment term |
30% deposit and 70% balance |
Port of delivery |
Ningbo, Shanghai, etc |
Samples |
available |
Express |
TNT, DHL, FedEx, etc |
1) Can we get your free samples?
Yes, you can. Our Samples are free for the customers . But the freight for express is
on buyer's account.
2) Can we combine many items size in one container in my first order?
Yes, you can. But the quantity of each ordered item should reach our MOQ.
3) What is the normal lead time ?
A. We will send goods to you within 15-35 work days after we receive your 30% deposit.The detail is based on the current production schedule.
4) What is your payment term?
T/T. 30% deposit, balance against the B/L copy within 25-30 days after departure from port.
5) What is your shipping way?
We will help you to choose the best shipping way according to your detail requirements.
By sea, by air, or by express, etc.